August 2, 2017 at 6:00 PM - Facilities Committee
| Public Notice |
|---|
|
1. 2006 and 2008 BOND PROGRAM and LOCAL CONSTRUCTION PROJECT
|
|
1.A. Mission High School (MHS) Phase III Renovation Project–PBK Architects
|
|
1.A.1. Status Report
|
|
1.A.2. Consideration and Approval of CPR #41 for Landscaping and Irrigation for the MHS Phase III Renovation Project
|
|
1.A.3. Consideration and Approval of CPR #53 to “Credit” Stainless Steel Trim at Kitchen Area for the MHS Phase III Renovation Project
|
|
1.A.4. Consideration and Approval of CPR #56 for Electrical Secondary Lines at the Agricultural Science Building Area for the MHS Phase III Renovation Project
|
|
1.A.5. Consideration and Approval of CPR #57 to Install New Regulators to Boilers at Building D Area for the MHS Phase III Renovation Project
|
|
1.A.6. Consideration and Approval of CPR #58 to Re-Connect Existing Light Pole at Building N Area for the MHS Phase III Renovation Project
|
|
1.A.7. Consideration and Approval of CPR #59 to Install Eighteen (18) TV Screens at the Cafeteria Dining Area for the MHS Phase III Renovation Project
|
|
1.B. Tom Landry Stadium Renovations Project – Alvarado Architects & Associates, Inc.
|
|
1.B.1. Status Report
|
|
1.B.2. Consideration and Approval of Additional Seven (7) Delay Days for AEA#11 for CPR #21 for the Tom Landry Stadium Renovations Project
|
|
1.B.3. Consideration and Approval of AEA#12 for CPR #22 for Landscaping and Irrigation for the Tom Landry Stadium Renovations Project
|
|
1.B.4. Consideration and Approval of AEA#13 for CPR #24 to Up-Grade the Scoreboard System for the Tom Landry Stadium Renovations Project
|
|
1.B.5. Consideration and Approval of CPR #23 for Speaker System for the Tom Landry Stadium Renovations Project
|
|
1.C. Stadium Bleacher Project for Leo Najo Baseball Stadium and Veterans Memorial High School (VMHS) Football Stadium - Alvarado Architects & Associates, Inc.
|
|
1.C.1. Status Report
|
|
1.C.2. Consideration and Approval of Proposal and Approval to Enter Into Contract with Alvarado Architects & Associates, Inc. for the Stadium Bleacher Project for Leo Najo Baseball Stadium and VMHS Football Stadium
|
|
1.D. School Marquees Project – R. Hinojosa Structural Engineering
|
|
1.D.1. Status Report
|
|
1.D.2. Consideration and Approval for Change Order #1 for Re-work Engineered Drawings for the School Marquees Project
|
|
1.D.3. Consideration and Approval for Substantial Completion for the School Marquees Project
|
|
1.E. VMHS Tennis Court Lights and Canopy Project –Chanin Engineering
|
|
1.E.1. Status Report
|
|
1.F. Mission Junior High School (MJHS) Science Building Chiller Project – Halff Associates
|
|
1.F.1. Status Report
|
|
1.G. North Side Swimming Pool Project – C. T. Brannon Engineering
|
|
1.G.1. Status Report - Awaiting Contract Award and Notice to Proceed to Contractor
|
|
1.H. 2006 and 2008 Financial Update and Qualified School Construction Bond (QSCB) Financial Update
|
|
2. Informational: Operations Division
|
|
2.A. Fixed Assets/Warehouse/Records/Textbooks Department
|
|
2.A.1. Approval to Declare Miscellaneous Items as Surplus and Authorize Disposal through On-Line Auction
|
|
2.B. Maintenance Department
|
|
2.B.1. 2016-2017 End of The Year Work Order Report
|
|
2.C. Transportation Department
|
|
2.C.1. Status on New Bus Purchase
|
|
2.C.2. Transportation North Hub Report
|
|
3. Others:
|
|
3.A. MHS Tennis Courts Lights and Canopy – Mr. Roosevelt Rios
|
|
3.B. Consideration and Approval for the Ranking of Qualifications and Approval to Enter Into Negotiations with the Top-Ranked Firms in the Order of Selection for the Fiscal Year 2017- 2018 HVAC and Lighting Commissioning for Projects
|
|
3.C. Consideration and Approval of Proposal and Approval to Enter Into Contract with Javier Hinojosa, Civil Engineering for a Feasibility Study for Baseball and Softball Facilities at MJHS, Alton Memorial Junior High School (AMJHS), Kenneth White Junior High School (KWJHS) and Rafael Cantu Junior High (RCJHS)
|
|
3.D. Consideration and Approval of Proposal and Approval to Enter Into Contract with Javier Hinojosa, Civil Engineering for the Fencing at Tom Landry Stadium and Leo Najo Baseball Park Project
|
|
3.E. Consideration and Approval of Proposal and Approval to Enter Into Contract with Javier Hinojosa, Civil Engineering for the Track and Field Event Facilities for MJHS, AMJHS, RCJHS and KWJHS
|
|
3.F. Caliche Pad for the Transportation North Hub Project
|
|
3.F.1. Consideration and Approval of Project and Proposed Budget for the Caliche Pad for the Transportation North Hub Project
|
|
3.F.2. Consideration and Approval of Procurement Method, Selection Criteria, Review and Ranking Committee, Wage Rate, and Authorization to Seek Proposals/Bids for the Caliche Pad for the Transportation North Hub Project
|
|
3.F.3. Consideration and Approval for the Selection of our on Call Civil Engineer for the Caliche Pad for the Transportation North Hub Project
|
|
4. Adjournment
|