August 14, 2024 at 6:00 PM - Facilities Committee Meeting
Agenda |
---|
I. Call Meeting to Order
|
II. Project Updates
Description:
- RFP for High School HVAC Valves and Actuators Replacement went out, bids are due 8/19
- RFP for High School HVAC Shut off valve replacement went out, bids are due 8/19
- RFP for PRE Unit Ventilator replacement went out, bids are due 8/19
- Repaired broken irrigation pipe on HS practice field
- HS Locker Room hot water heater in planning phase with Rob's Heating and Cooling
- PRE Title IV Shower project in planning phase with Apollo
- Boiler Strip and Clean project in planning phase with Atlas Boiler
- Repaired broken and leaking supply water line to HS fire hydrant in pre planning phase
- Annual backflow inspections on double check valves for supply lines to PRE, IDH, PRJH and PRLHS completed by McKinstry mechanical - WBCSD now in compliance with City of Priest River.
- Repaired failing double check valves backflow assemblies near completion by McKinstry mechanical
- Separation doorway in the High School placed between the designated high school and junior high areas has been framed and drywalled.
- Special thanks to Chad Yount for donating materials and labor for the framing of the separation door.
- Special thanks to Jonathan Welch for donating materials and labor for the drywalling of the separation door.
- Special thanks to Rob from Bighorn Services for donating materials for the doors, crashbars, and the door hardware.
- The HS door project was a true testament to the way that this community rallies around each other to help this school district succeed against all odds. Together we can do big things!
|
III. Summer Custodial
Description:
- The crew have done an excellent job team cleaning all buildings and the buildings are looking great well ahead of schedule.
- Late Summer tree trimming and landscape projects in process
- The crew have been mowing and doing a great job working as a team to stay on mowing with less impact to building time as we anticipated.
- Special thanks to Brandon Goins for his crew who have been mowing the High School game field and practice field all summer.
|
IV. HB 521 - Facilities Condition Assessments & 10 year Master Plan updates
|
V. Priest River Junior High one year building closure strategy updates
Description:
- Meeting and site walk conducted on July 31st with Apollo mechanical and local industry experts.
- OBJECTIVES: Formulate a plan to close the building which will secure the building, and meet the upkeep and maintenance needs of the building for the 2024/2025 school year so that we;
|
VI. Open Discussion
|
VII. Adjourn Meeting
|